Competent personnel
PW4 capability supports three-phase wiring and testing endorsement, while A4 capability covers low-voltage chargeman competency. These are role-based capabilities supporting registered manufacturing.
Logicart is registered by Suruhanjaya Tenaga to manufacture low-voltage switchboards up to 0.600 kV, supported by qualified competent personnel, suitable test equipment and documented quality control.
Registration is part of responsible manufacturing and customer assurance—not merely a badge. It connects the manufacturer's declared scope with competent personnel, safe working arrangements and suitable testing capability.
Regulation 92 of the Electricity Regulations 1994 requires a valid Certificate of Registration to manufacture switchboards in the course of trade or business.
PW4 capability supports three-phase wiring and testing endorsement, while A4 capability covers low-voltage chargeman competency. These are role-based capabilities supporting registered manufacturing.
Manufacturing and verification activities are organised around suitable protection for employees and disciplined electrical work practices.
Panel verification is supported by instruments and equipment appropriate to the electrical and functional tests defined for the project.
For low-voltage registration, Regulation 93 addresses competent personnel, employee protection and suitable equipment and instruments for switchboard testing.
Logicart's current Form U registration covers low-voltage switchboards up to 0.600 kV. Registration documentation is available to customers upon request.
This scope supports customers seeking a Malaysian panel manufacturer with a clear regulatory basis and the internal capability needed to verify what it builds.
We define the electrical duty, operating sequence, interfaces and maintainability needs before finalising the panel design.
Power distribution, control hardware and software are brought together as one application-specific system.
The completed panel is checked against its drawings, project scope and agreed test procedure before delivery.
Testing is part of the story. See how we verify every project-specific panel →
Discuss the application, control requirements and project documentation with our engineering team.
Discuss your panel project ↗